| Environmental Permitting for Major Water Supply Company, UK |
| |
| Due Diligence audit, Aerospace Sector, UK |
| |
| Due Diligence audit of Hazardous Waste Operations, UK |
| |
| Due Diligence audit of Industrial Gases business, UK/GER, Pre-acquisition |
| |
| Due Diligence audit of Industrial Gases business, GER, Pre-divestment |
| |
| IPPC Support, Electronics Component manufacturer, UK |
| |
| IPPC Support, Consumer Goods Packaging company, UK |
| |
| SHE Management System development, (including oil spill response procedures, Russian Fed) |
| |
|  |
IPPC Support, Consumer Goods Packaging company, UK
| Client: |
Confidential |
| Location: |
South of England, U.K. |
| Date: |
2003 |
| Project: |
Phase 1 Environmental Site Assessment (ESA), and process technology support to obtain IPPC authorisation. |
Abricon carried out a Phase 1 ESA to assist the company to obtain an IPPC authorisation for its operating processes.
A baseline contamination statement was produced as part of the ESA Report requirements for the IPPC permit application.
Subsequently Abricon provided assistance to the client to carry out a review of BAT (Best Available Techniques) applied at the site to minimise releases to all three environmental media (again to support the IPPC application).
|
 |
|